Electrical Installations for Wooden Houses

Professionally completed and labeled electrical panel

Complete Electrical Installations – Safety and Compliance for Your Home

EcoCasa executes Complete electrical installations for wooden houses and residential buildings, with strict adherence to safety regulations. We design, size, and install all the necessary circuits for a modern home: outlets, lighting, high-power appliances, electrical panels, and protection systems.

We are working with authorized electricians ANRE, who knows the specifics of wood constructions and the special fire protection standards imposed by normative I7/2011. Each installation is designed according to the house plan, the number of circuits required, and the installed power, then executed with certified materials and documented for ISC acceptance.

From initial consultation and electrical design, to installation, commissioning, and delivery of the acceptance file – we manage the entire process. For our turnkey wooden house projects, the electrical installation is included in the full package. We also carry out separate electrical installations for clients who already have the house structure.

Why choose EcoCasa for your home's electrical installation?

Authorized ANRE Electricians

Team of electricians with valid ANRE authorizations for design and execution. Technical documentation is reviewed by an authorized designer, and upon completion, you receive the acceptance protocol according to I7/2011.

Wood House Specialization

We are familiar with the special regulations for wooden constructions: fire-retardant cables, FRHF conduits, minimum distances from wooden materials, enhanced fire protection. Safe installations, compliant with current regulations.

Electric Project Included

Before installation, we prepare the detailed electrical project: single-line diagrams, placement of sockets and switches, circuit sizing, and installed power calculation. The project is intended for ISC authorization.

Complete Protection

Modular electrical panel with residual current circuit breakers (30mA), surge protection device (SPD) for lightning protection, earthing. All circuits individually protected.

Modern Solutions

LED lighting, USB outlets, smart switches, dimmers, automation systems (smart home). We adapt the installation to your needs, from a classic home to a connected dwelling.

Complete Documentation

Upon completion, you will receive: a reception report, as-built drawings, material conformity certificates, a measurement sheet (insulation resistance, grounding, RCD check). All for the ISC file.

Secured electrical connections in junction boxes

What does a complete electrical installation for your wooden house include?

A professional electrical installation isn't just about running wires and installing outlets. At EcoCasa, we complete the entire electrical system, designed for long-term safety and modern user comfort.

Electrical service entrance and main panel

Connection to the distribution grid (ENEL/Electrica), IP40 modular electrical panel sized for the house's needs (24-72 modules). Main switch, 30mA main residual current device, circuit breakers for each circuit, and surge protector.

Outlet circuits – Each room

Dedicated circuits with NYM-J 3x2.5mm² cables, 16A protection on each circuit. Minimum of 4 outlets in the living room, 6-8 in the kitchen, 2-3 in the bedrooms, IP54 rated outlets with covers in bathrooms and outdoors. Integrated USB outlets upon request.

Lighting Circuits – Interior and Exterior

Circuits with NYM-J 3x1.5mm² cables, 10A protection. Installation of lighting points in all rooms, single/double/staircase switches (two-way) for hallways. Outdoor lighting for terraces, yard, walkways – with motion sensors upon request.

Powerful circuit devices

Dedicated circuits for appliances over 3kW: stove (3x4mm²), electric boiler (3x4mm²), washing machine, central heating unit, oven. Each with separate protection and a specific socket (16A or 32A).

Protection and Safety Systems

Lightning protection system (optional), Class I+II+III surge arrester, grounding system with ground electrode under 10Ω, smoke and carbon monoxide detectors (in accordance with regulations for wooden houses).

Special installations (upon request)

Data outlet (Cat. 6 UTP), video intercom, anti-burglary alarm system, smart home automation (control lights and outlets via app), photovoltaic solar installation with inverter and storage.

Technical note: All work is performed in accordance with I7/2011 (Low Voltage Electrical Installations), using ANRE certified materials. Upon completion, mandatory checks are performed: insulation resistance measurement, RCD verification, ground resistance measurement – all documented in the PRAM report.

How does the execution proceed electrical installations EcoHome

From consultation to commissioning – transparent 5-step process

Stage 1: Consultation and site visit

We will travel to your location (in Bacău or anywhere in Romania for our wooden house projects) to discuss your needs: number of rooms, special features (smart home, alarm, lightning rod), estimated installed power. Initial consultation is free.

 

Stage 2: Detailed Electrical Project

The design electrician prepares the technical documentation: single-line diagram, layout plan (socket outlets, switches, lighting), voltage drop calculation, cable cross-section sizing, complete materials list. You will receive the approved project, necessary for the ISC authorization.

 

Stage 3: Installation Execution

Our team installs the system in 2 phases: rough phase (pulling cables, junction boxes, protective conduits) before interior finishes; Final stage (installation of sockets, switches, light fixtures, electrical panel) after plastering and painting. Average duration: 2-4 weeks for a standard house.

Stage 4: Checks and Commissioning

Upon completion of the installation, an authorized electrician performs all mandatory PRAM measurements: cable insulation resistance, RCD operation (30mA test), grounding resistance value (below 10Ω), and protective conductor continuity. The results are documented in the verification report.

 

Stage 5: Document Receipt and Delivery

We are handing over the complete file: as-built electrical project, PRAM report, material conformity certificates, signed acceptance protocol. With these documents, the house can be accepted by the City Hall and ISC without any issues. We offer a warranty according to the contract for all executed works.

 

In short: From the first discussion to handing over the keys, we manage the entire process. You don't have to chase electricians, buy materials, or deal with ISC documentation – we'll handle it all.

Frequently Asked Questions

We offer both options. For clients building a wooden house with EcoCasa, the electrical installation is included in the complete turnkey package. We also perform separate electrical installations for clients who already have the house structure (regardless of who built it) and require certified electricians for the installation part. Contact us for a personalized quote.

We carry out electrical installations throughout Romania, with priority for our wooden house projects. The team of electricians travels anywhere in the country. For remote projects, we ensure the same quality of execution and complete documentation as for local work in Bacău. The cost of travel is calculated based on distance.

The duration depends on the size of the house and the complexity of the installation. For a standard house of 100-150 sqm, the execution takes an average of 2-4 weeks, divided into 2 phases: rough-in phase (laying cables, conduits, junction boxes) before plastering, approximately 1-2 weeks; final phase (installing outlets, switches, electrical panel, light fixtures) after finishing, approximately 1-2 weeks. For larger houses or those with complex systems (smart home, lightning rod, photovoltaic), the duration increases accordingly.

We offer a 2-year warranty on installation work according to the Civil Code, during which we will repair any defect caused by improper execution free of charge. The materials used (cables, sockets, switches, electrical panel) come with their own manufacturer warranties (2-10 years depending on the product). The warranty does not cover defects caused by network power surges, improper use, or unauthorized modifications to the installation by third parties.

Upon completion, you will receive the complete file required for ISC reception: the as-built electrical project (actual execution diagrams), the PRAM report (insulation resistance measurements, grounding, RCD test), conformity certificates for all materials used, a reception certificate signed by an authorized electrician, and user and maintenance instructions. With these documents, your house can be registered by the city hall and obtain its operating permit without issues.

Yes, we adapt the installation to your needs. We offer: LED lighting with dimmers and predefined scenes, sockets with integrated USB, smart switches (app control), automation systems (lights, blinds, air conditioning via Wi-Fi/Zigbee), on-grid or hybrid photovoltaic systems with inverter and storage, electric car charging stations (wallbox). All solutions are integrated from the design phase for a clean and efficient implementation.

The electrical installation in a wooden house follows the same standards (I7/2011), but with increased fire protection requirements, as wood is a combustible material. The main differences are:

  • FRHF (Flame Retardant Halogen Free) protection tubes are mandatory – not standard PVC.
  • Cables with flame-retardant insulation, type NHXH or N2XH, on critical routes.
  • Minimum distance of 5 cm between unshielded cables and the wood surface.
  • Special anchor bolts for timber-frame walls (not for concrete).
  • Recommendation for AFDD (Arc Fault Detection Device) circuit breakers for fire prevention.
  • Pass through I-Joists only in structurally validated areas.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Scroll to Top